Schedule of Mechanical Permit Fees

Permit Issuance

Permit Base Fee 
Final Inspection
Permit Renewal 3 months (limit of 2)
New Single Family Residence
Addition Inspections (per inspection)
Plan Review (per sheet)
Contractor Annual License Fee

Unit Fees (in addition to permit issuance fees)

A/C System (install/alter/relocate)
Air Handler
Boiler Compressor up to 3 HP
Boiler Compressor 3 to 30 HP
Boiler Compressor over 30 HP
Burner – Forced Air Gravity
Cooler – Evaporative
Cooling Systems
Cooler – Walk In
Duct Work (new/alter/repair)
Exhaust Hood/Exhaust Vent
Fire Suppression (per 10 heads)
Furnace
Floor Furnace
Gas Piping System
Heater – Floor, Recessed, Suspended or Wall
Incinerator
Refrigeration Unit
Roof Top Unit
Vent – Appliance
Vent – Fireplace Insert
Ventilation Fan
Ventilation System – Separate
Water Heater
Other Items Not Listed

Fees (per unit)

50.00
35.00
35.00
170.00
35.00
35.00
10.00

    

25.00
18.00
15.00
35.00
85.00
20.00
13.00
13.00
13.00
13.00
13.00
20.00
25.00
15.00
10.00
18.00
30.00
13.00
22.00
9.00
25.00
10.00
15.00
10.00
18.00

Schedule Revised July 2016